+3
$3.00Starting Bid
High Bidder:
Bidding History: 0 Bids
Completed
Measurement:
Condition:Works Well
Section:1-C
Category: Tools and Shop Equipment

Bidding Opened:

Bidding Closes:

3960 W. Saginaw Road, Vassar, Michigan 48768

This is an online only auction that begins closing on MONDAY, November 1 at 6:00pm!  The entire auction will take approximately 2 1/2 hours to close and closes within the range of 20-30 items per minute. This auction will feature our automatic Group Extension.

10% BUYER'S PREMIUM will be added to all items purchased, buyer's premium becomes part of the purchase price and will be reflected on your invoice.(Example: If your winning bid is $10, you will be paying $11).

6% Sales Tax will be added to all items purchased. If you are exempt from paying Sales Tax (farm, use, resale, etc.), you will need to fill out an Exemption Form.

NOTE: Item descriptions are provided by the sellers/consignors. If you are not able to inspect listed items during one of our regularly scheduled preview days, feel free to call or E-mail us to verify item descriptions. All items are sold "AS IS, WHERE IS" - Albrecht Auction Service, LLC ("Albrecht Auction"). SELLERS FURNISH ALL AUCTION ASSETS TO BUYERS "AS IS," UNSUPPORTED, WITHOUT WARRANTY OF ANY KIND. ALBRECHT AUCTION AND SELLER DISCLAIM ALL WARRANTIES, EXPRESS OR IMPLIED, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Assets are sold in their actual current condition, with all faults and defects, and with all errors of description. ALBRECHT AUCTION'S liability to a purchaser will never exceed the actual purchase price paid for an asset. Bidders accept all auction assets "with all faults", whether or not immediately apparent. Bidders are responsible for ascertaining actual current condition through personal inspection and careful review of the description, pictures, video and/or support documentation. Every bidder agrees that his or her decision to bid and the amount he or she bids have been based solely on his or her own independent inspection and evaluation of the auction assets. Bidders are strongly advised by ALBRECHT AUCTION to take care to satisfy all questions or concerns about the auction process, bidding process or auction assets before placing a bid.

Auction company cannot, and will not, be held responsible for any interruption in service, errors, and/or omissions, caused by any means and does not guarantee continual, uninterrupted or error free service or use of the Site. Bidder acknowledges that this auction is conducted electronically and relies on hardware and software that may malfunction without warning. The auction company, in its sole discretion, may void any sale, temporarily suspend bidding and re-sell any item/lots (or the entire auction) that were affected by any malfunction or for any other reason. The decision of the auction company is final.

See Full List of Terms for Buying in 'Buying' Link above, or by Clicking this Link: Bidding and Buying

Saginaw Road CHECKOUT DATES:
Tuesday, November 2 from 9am to 5pm
Wednesday, November 3 from 9am to 6pm
Thursday, November 4 from 9am to 6pm
Friday, November 5 from *8am* to 3pm

SHIPPING: Most small/unbreakable items may be shipped for a fee (Shipping and handling charges will be added.). Please call for shipping information by Tuesday @ 5:00 p.m., following the auction.

STORAGE: If you are not able to pick up your items during a scheduled checkout day, please call to make payment and have your items placed in storage (minimum $5 fee). If you do not contact us and your auction items are not picked up by the last scheduled checkout date, the storage fee will be automatically added to your invoice, and your card on file will be charged for the full invoice total and/or storage fee. Your paid items will be stored for 19 days. If they are not picked up within this time, you will be forfeiting ownership of your stored items to Albrecht Auction Service. Albrecht Auction is not responsible for lost/stolen items that are not picked up during our regularly scheduled checkout dates.

Accepted forms of payment are Cash, Michigan Check (with Driver's License), PayPal or Visa/MC/Discover. NOTE: No Credit Card payments or PayPal will be accepted on individual items selling for over $2,500.00. PayPal or Authorize.net online invoice payments cannot be accepted for firearms or ammunition. No out-of-state checks will be accepted. No personal checks written for over $500 will be accepted - unless the buyer is known by Albrecht Auction. Please call our office for check approval.

Come Take a Look in Person! You can also Call or Email us with Questions!

PREVIEW DATES @ Saginaw Road: 

Thursday, October 28 from 1:00pm to 6:00pm

Friday, October 29 from 8:00am to 3:00pm

Monday, November 1 from 12:00pm to 5:00pm

Descriptions are provided by the sellers. Please come to a live preview for item verification.

Preview Guidelines:
 
  • No Public Computers will be available, but bids can be placed for you.
 
  • Masks and Social Distancing are Encouraged.
 
  • Public Restroom is not available. We will have a Port-a-jon available at each location.
  • There will be 2 entry points into the building, one at South end, one at West side.

  • Please do not come if you are not feeling well!

ACCEPTING QUALITY CONSIGNMENTS for November 1st Saginaw Road Auction: 

*Tuesday, October 19 from 9am to 4:30 pm (NO large loads of indoor items);
Wednesday, October 20 from 9am to 5:30 pm;
Thursday, October 21 from 9am to 5:30 pm;
*Friday, October 22 from 8am to 2:30 pm;

*We Cannot Accept Large Trailer Loads or Large Furniture Pieces on Tuesday or Friday Due To Limited Floor Space! Call for Details!

*IF YOU ARE A NEW CONSIGNOR, please E-mail us at info@bidnow.us if you would like to know our Commission Rates and Listing Fees!

Accepting: Farm/Construction Equipment, Autos & RVs, Tools, Sporting Goods, Furniture, Appliances, Antiques, Coins, etc.

Attention ALL Consignors: If you plan to drop your item(s) off at one of our two Vassar locations, please make sure to arrive NO LATER than 30 minutes before our building is scheduled to close (drop-off times will vary, depending on the day). If you arrive with your item(s) within the last 30 MINUTES before closing, your item(s) may be turned away. We will be enforcing this “Last Load” policy EFFECTIVE IMMEDIATELY, so make sure to arrive with plenty of time to spare if you plan to drop-off! “Calling ahead” will NOT necessarily keep you from being turned away if you physically arrive after last load deadline.

The bidding increment will follow the rules below.

RangeIncrement
$10.01 or below$1.00
$10.01 to $50.01$2.00
$50.01 to $200.01$5.00
$200.01 to $500.01$10.00
$500.01 to $1,000.01$25.00
$1,000.01 to $5,000.01$50.00
$5,000.01 to $20,000.01$100.00
$20,000.01 to $50,000.01$250.00
$50,000.01 to $100,000.01$500.00